AMR project screening built around loads, routes, interfaces and acceptance evidence.Open the RFQ checklist
AGILOX autonomous mobile robots moving totes through a marked warehouse route
Warehouse robotics, specified clearly

AGILOX mobile robot projects start with the operating boundary

Define load units, route geometry, peak windows, control handshakes and exception recovery before comparing fleet capacity. The result is a shorter path from concept to testable acceptance.

LoadDimensions, mass, center of gravity
FlowSKU mix, peaks, buffers
ControlWMS, WCS, PLC, FMS ownership
ProofFAT, SAT, recovery evidence
Evidence rail

Four gates keep the headline rate honest

Each gate ties a project statement to a stated operating condition and a reviewable deliverable.

01

Design Rate

Order lines or moves per hour, qualified by SKU velocity, load mix, replenishment demand, peak duration and buffer occupancy.

Rate inputs →
02

Factory Acceptance

Robot behaviors, safety functions, fleet rules and interface messages checked against an agreed simulation or test profile.

FAT scope →
03

Site Acceptance

Real floor, wireless, traffic, charging and host-system conditions exercised with recovery cases and accountable owners.

SAT planning →
04

Service Response

Escalation, spares, remote access, maintenance access and mean-time-to-repair assumptions documented by project scope.

Support boundary →
Material-flow view

Place mobile robots where they remove constrained travel

A flow-stage view prevents technology labels from hiding upstream starvation, downstream blocking or manual handoff work.

01

Receive

Move inbound pallets or totes from verified handoff points while dock variability and inspection holds remain visible.

02

Store

Connect reserve or forward locations without implying direct selectivity where dense storage or sequencing governs access.

03

Move

Model robot traffic, intersections, pedestrian rules, charging and queue capacity against the busiest operating window.

04

Pick

Feed workstations at a rate that includes operator variability, tote exchange, replenishment and unavailable destinations.

05

Sort

Coordinate dispatch decisions with lane capacity, divert confirmation and exception routing at control-system boundaries.

06

Ship

Stage completed loads by carrier or route without allowing trailer cutoffs to create unplanned congestion upstream.

Evaluation points

Six details that change fleet sizing

01

Load definition

State dimensions, weight, underside, center of gravity, overhang and orientation at every pickup and drop.

02

Aisle geometry

Record clear width, turning space, floor transitions, gradients, doors, crossings and maintenance escape paths.

03

Demand profile

Separate average and peak work, peak duration, SKU velocity, order structure and replenishment competition.

04

Fleet safety

Review scanner fields, traffic priority, restricted zones, manual intervention and human-machine separation.

05

Interface ownership

Assign WMS, WCS, WES, PLC and fleet-manager commands, acknowledgements, timeouts and alarm escalation.

06

Recovery design

Test blocked routes, lost loads, low battery, network loss, host silence and controlled fallback operation.

Operating profiles

One robot platform, different warehouse constraints

The matrix is a discovery aid, not a performance promise. Actual sizing follows measured data and an agreed operating concept.

EnvironmentSKU depthPeak factorTemperatureTypical load mix
E-commerce fulfillmentHigh and volatilePromotion-driven surgesAmbientTotes, cartons, returns
Grocery distributionBroad, high velocityWave and cutoff peaksAmbient / chilled zonesCases, totes, roll cages
Cold-chain warehouseControlled rangeDoor-window constrainedChilled / frozenPallets, insulated totes
Manufacturing logisticsBOM-dependentTakt and shift peaksProcess-specificPallets, racks, line kits
Multi-client DCContract-dependentOverlapping customer peaksMixed zonesPallets, cartons, totes

E-commerce

High SKU depth, promotion peaks, ambient totes and cartons.

Grocery

Cutoff-driven flow across ambient and chilled zones.

Cold chain

Restricted doors, low temperatures and insulated loads.

Manufacturing

Takt-linked line feeding with pallets, racks and kits.

Multi-client DC

Overlapping profiles and tenant-specific operating rules.

Next input

Turn warehouse observations into a reviewable AMR brief

Start with what moves, where it moves, when demand peaks, which system issues the mission and how operators recover an exception.